Wednesday, October 25, 2006

Pulling Tubes

Radiant heat.


Hot water goes through these tubes under the slab floor.


If you thought these tubes were made in China you would be....WRONG. They are made in Canada.


Still a little bit left to go. Slow and sort of steady sometimes sort of wins something for someone, somewhere.

Tuesday, October 24, 2006

What A Mesh!

Radon barrier inspection passed. Phew!

Pre-used/Salvaged foam placed ever so. Mesh sheets placed on top.




We bought the mesh at Rona. My God, what a miserable experience! NEVER AGAIN. Absolutely not worth the 50 some-odd bucks saved. Miserable product and surly service. Always go with an actual person, preferably one you like.




And speaking of little guys, this is Solo. We like him. He's half chihuahua and half seal (and all cute!)



Radiant heat tubing to be installed at some juncture or another. After that, pour the floor!

Saturday, October 21, 2006

Radioactive Gas

In the previous post, it was mentioned that "the water was done", only the inspection for the sewer lines was done.

We still needed the 'water in' (the black pipes) as well as phone and internet (the orange ones.) The grey pipe in the middle is the power.


After the lines were in, they needed to be buried in good clean material so we used the last of the rammed earth mix. This was carried up the considerable grade by wheelbarrow, as our old pal the bobcat has finally left for it's mountain home.



The lady did the shoveling and the man did the wheeling and dumping. It was a good day for reflecting on the teachings of Chairman Mao.



After we raked it out, we screeded the surface with a long board and a level to get things flat.

Our luck with plate tampers held fast, and we had to return the first one after the handle broke off. Really, we should get a job testing those things.



After a few spins, the floor was remarkably smooth. That hole in the otherwise perfect surface is for the "thickened slab", an area which will bear some of the weight of the second floor.
Next the radon barrier went down. All it takes is a 6 mil sheet of plastic to protect us from a radioactive gas? Really? This step is important enough that it has it's own inspection, so maybe it does.


Hey, lets hear it for plastic! Yaaaay! Once we get the thumbs up, down goes the foam insulation, reinforcing mesh and the in-floor radiant heat system. Could a concrete floor be far behind?

Yes, those lumber wraps do look rather fetching over the tops of the walls, don't they?
Looks aren't everything though, we're trying to keep the fall rains from infiltrating our walls. The flapping noise when the easterly picks up is phenomenal. Maybe one day, we'll try our hand at wrapping the A&W in silk or something.

Wednesday, October 11, 2006

Laying Pipe

Yes! Laying pipe!


The water is done.


The water lines need to be tested--filled with water in front of the inspector to prove there aren't any leaks.



The water lines help give an idea of where everything is going to go.


This is where the water goes out


Gas lines go in next. Once they are in, everyone will get covered up with soil.

Naughty Teens

Yes! Naughty teens! Doing the time honored 'playing with matches' a group of them managed to char a few acres in the hills right behind the house. (But hey, if the teen years aren't for setting flame to a tiny, rare and fragile ecosystem, then what are they for?)


We missed the entire event. The helicopter, the firemen, the neighbors giving the naughty teens the ass ripping of a life time.


In doing this photo shoot, this delightful hole was found right in the midst of the char. It would make a lovely location for an album cover, don't you agree?